a. The first action pertinent to the orgeaisation of the 1220th was taken about 10 October when the 18th ~ineer Compay was alerted for movement about 1 ~ovmber. h Construction 22 October USARPAC received informal instructions (in the Alert Order) to activate the 1220th Engineer Provisional Battalion (Topo Const) which was to iuclude the 18th ~glneers. nel w~s 12 liovem”oer ad Its retidinessdate for shipment of person- cargo 8 liovember. Total strength was 560 and it i~cluded some Stivy,kir and krine personnel. Major WJ A Hussey w~s designated comm~der on 24 October 1947 and given specific instructions as to his mission of rehabilitation of facilities at Entwetok (unex 7). b. The (1) 1220thmoved to Eniwetok as follows: Personnel Pearl of the 1220$h~B loaded at Iroquois Point, krbor, T.H.,at approximately 0900, 15 Nov- ember 1947, and departed in coavoy as the initial force under control of C* 7.3 for Eniwetok at tip proximately 1430 on same date as follows: LST 219 8 Off LST 611 Ls!r 45 2 111 m 10 1.28 (q & Al) (Navy) (Army & Al?) 6 122 (“ LSD Comstock 4 89 42 =IM (na) (Havy & Marine) (all Services) TOIQ (2) roff “) On 18 November the Coastal Crusader departed for l!hiwetokwith a load of cargo amd two Amy SEJTION V .’ ., ,., Officers.

Select target paragraph3