a PRIVACY ACT MATERIAL REMOVED to deactivation of the base about June 1947. Ensign Ellis accompanied the JTF 7 staff who made the preliminary survey of the Atoll. Ensign WM also prepared a list of materials which he considered necessary to install the utilities required, based on an anticipated island population of two thousand (2000) men during the height of the operation. This list was supplementary to the original one prepared by the planning staff of JTF 7. Ensign SN, CEC, USN, also another early arrival was assigned the duties of POL Officer. Ensign (iMwas to prepare to receive fuel into the fuel tank farm from tankers. During this period an organization plan for the Utilities Team was drawn up and put into effect upon request of Major (my. This organization placed Lt.(jg) S9MMMMk es OIC and made the team in effect, a utilities platoon within the 18th Engineer Construction Company. Responsibility was further delegated by making Lt Qi, the supervisory officer over installation and operation of water distillation equipment and the allied jobs of plumbing and pipefitting. Ensign GM was designated supervisory officer over the electrical and generator sections and temporarily in charge of re- frigeration equipment. Ensign = remained OIC of POL supply and was to take over the refrigeration seetion from Ensi-n Sie as soon as the initial stock of fuel was received. This division of responsibilities remained basically unchanged throughout the operation. The 1220th Provisional Battalion sailed from Honolulu on or SECTION VI-b 3 PRIVACY ACT MATERIAL REMOVED ng

Select target paragraph3