prepared to contact and report the presence of any hostile submarines, end to take prompt and effective retaliatory action, if required. (2) That all vessels take necessary action to comply strictly with prescribed conditions for damage control organization, watertight integrity, and surface (anti-submarine) lookout coverage. be The following readiness conditions were prescribed: (1) MT. MCKINLEY, CURTISS, ALBEMARLE, BAIROKO - Conditim 4 (paragraph 1120, USF-2) with engineering plant ready for 17 knots, split plant operation as desired; an adequate damage control watch to insure full compliance with the requirements for Condition B and to function efficiently and promptly in case of underwater damage from torpedoes or mines; and special emphasis on canplete surface lookout coverage. (2) | All destroyers - Condition 3 (paragraph 1117, USF-2) with engineering plant ready for 25 knots (Engineering Condition 33), but without split plant operation, an adequate damige control watch to insure full compliance with the requirements for Condition B and to function efficientlyand Section VI] 57 .

Select target paragraph3