CHAPTER XV PRIVACY ACT MATERIAL REMOVED ENGEBI ISLAND The construction on Engebi Island commenced with the arrival of the survey party, the foundation crew of the MK-PK Company and fourteen (14) Enlisted Men from the 18th Engineer Construction Company. Work was immediately started on the excavation for the Zero tower footings and clearing and initial grading for the main control line between the Zero tower and the timing station sites. Until 24 December, all conatruction personnel, civilian and military, lived aboard the LST 45 or the IST 219 which were alternately anchored offshore to serve as "floating hotels", Pending the arrival of the remainder of the 18th Engineers from Eniwetok, the Resident Engineer, JTF 7 directed the activities of the advance party from this unit. When the entire Company arrived at Engebi, Captain MMe, Company Commander, was in direct charge of construction operations. From the start of construction, and practically up to its completion, one of the major activities, from a standpoint of manhours required, was the off-loading of small boats which brought material ami equipment to the ielani. This was necessitated by the fact that numerous large coral heads on the lagoon side and the reef on the ocean side prevented beaching or docking of larger vessels. By 16 December, the Zero tower footings were completed, survey and layout for the remainder of the structure was well advanced and a SECTION VIb 88 PRIVACY ACT MATERIAL REMOVED a

Select target paragraph3