The forms on Gamma "A" were stripped on 6th and 8th March,
revealing probably the best concrete finish of the entire project.
It was at this time that a fifteen (15) KW generator was added to the
power plant at the Timing Station which called for an alteration of the
shed to house it.
The 10th of March saw the arrival of the co-axial cable group
and they started work immediately.
Their line having been previously
established, a ditch was laid open that they might start layingtheir
cable.
The causeway constructed by the Hawaiian Dredging Company was
completed on the llth and with the fill job carried out by members
of this unit, regular traffic across it became heavy. This offered a
problem when the time came to lay the cable across the causeway, but
delays in re-routing traffic lasted only a day or two.
Gamma "C" were removed in the meantime.
The forms for
The Company Supply section
under Lt. QM and Staff Sergeant QMMMes completed
on the 11th a survey of all form 32's and submitted a requisition for
newly authorized clothing and equipment on arrival at home station.
All work on the Generator Shack and Timing Station was completed on
11 March.
.
cab Mer ee
|
All type "A" blast footings on Biijiri were completed on 12 March.
The ComMbity's véteran grader operator was also lost on the 12th March
when Technician Fourth Grade QQdeparted.for the VeSpopes ag
on a 30 day emergency leave and eventual transfer to Hq 2d ESB.
The wiring and utilities work on the Timing Station was completed