PRIVACY ACT MATERIAL REMOVED base, concluding construction work on that site. Work was started on that date on the Timing Station and the generator shack adjacent to it. | Gamma Station"B" and "C" were started on 9 February with the sites surveyed, excavations commenced and the batter boards erected. The Photo Tower was completed this date. | Blast footing "B" was surveyed on 10 February and construction ~ commenced on it the following day. The 10th also son the cable anchor poured and the llth the slab and paving under the 200 foot tower were poured. The survey party completed their work and departed, also on the llth. lst Sergeant Gm , of Regimental Headquarters Company, took over the constructimof the Blast Footings, ably assisted by Technician Fourth Grade Qi, ond Qpue of _this unit. This crew started work on Blast Footing "A" on 12 February. Erection of the fifty (50) foot poles also commenced this date. They . were completed on the 17th. On 18 February all blast footings on Aoman were completed and the following days work started on eight of the footings on Biijiri. The generator shack on Biijiri was completed this date. Staff Sergeant QD conducted experiments in soil stabilization during the period 16 to 20 February, employing the.use of a soil cement mixture. Experiments were also performed by sowing plots of ground with oats and grass. It was the soil cement combination however that was later to play a big part in stabilizing the SECTION Y¥Ib 8 3 PRIVACY ACT MATERIAL REMOVED.

Select target paragraph3