PRIVACY ACT MATERIAL REMOVED
destination will undoubtedly be received upon reaching the United
States,
ae
All excess clothing and miscellaneous impedimenta will be turned
over to the AEC at Oakland, California, for disposal.
The bulk of the
instruments employed in the operation will be sent either to the
Instrument Branch at Oak Ridge, Tennessee or to the Los Alamos Seien-
tific Laboratories, New Mexico, ‘Some of the laboratory equipment will
be sent to the National Institute of Health, Bethseda, Maryland, for
use by Commander Andrews in continuing his work.
An estimate of about one week was given as the time requirements
for closing out all supply shipment and logistics problems after
arrival at Oaklana, California.
ae
Technical Measurements,
The roll-up operations for the Technical Measurements Unit (TU7.6.6) were extremely simple in nature since little expensive equipment
was involved.
All films and thermal radiation measuring devices were
ehinned to the United States by air.
The test animal
containers which were last used on Aoman Island were removed to the
lagoon and sunk,
Laboratory counting of the crater samples and other
radioactive materials will be continued on the BAIROKO until just prior
to arrival at the United States. -Some of those samples which were .
sufficiently radioactive and of particular interest will be shipped to
the National Institute of Health for the use of Commander J33ES in
Section IX
110
PRIVACY ACT MATERIAL REMO
VED
FY