PRIVACY ACT MATERIAL REMOVED
i.
Enroute to Pearl Harbor Lt.Commander QugMB®assisted in the
preparation of a memorandum to CJTF-7 from CTG-7,6 in reply to a
previously issued directive from the Task Force Commander on the
subject:
"Requirements for Future Atomic Tests",
This memorandum
was to include personnel, materiel and logistic requirements to be
used as a guide for any similar operations in the future,
On ZEBRA-plis®6 the supplyZsection began taking up the individual
equipment of the remaining members of the Task Group,
This equipment,
along with other materiel was packed and marked for shipment while
enroute to the United States.
All instruments were packed and crated
in special shipping boxes built to specifications for their shipment.
In additidn-to the instron#nts left for the Post=SANDSTONE Garris-ne
son others were left to bé‘used in monitotimg-ythe drone+planes on their|
return flight to the ZI.
|
These were as follows:
2 MX-6 Instruments
oe
6 263A Instruments
2 Charging Boxes for Kelly-Koett dosimeters
2h Kelly-Koett, 0.2r dosimeters.
Upon the arrival of the drones at Eglin Air Force Base, Florida, the
instruments will be packed and shipped to the Scientific Laboratory at .
Los Alamos in accordance with instructions received fromthe AEC, where
they will bereteived by Mr. 2B, .
Attached as Appendix "H" to this report is a copy of a memorandum
from Mr. SMM to CIG-7.6, attention Lt. CommanderQaaL,
Section IX .-
108
PRIVACY ACT MATERIAL REMOVED
a