COMWANDER TASK UNIT SEVEN POINT THREE FOINT SIX U.S.5. LSM 250 c/o Fleet Post Office San Francisco, Celifornia File No. CTU7.3.6/AS 19 April 1948 Serial: 0018 Subject: Report of Submarine Cable Operations. (con't) close to the fault. If it was found imprac- tical to take in cable from the point where the cable wes lifted to the fault, the cable was cut and tested in both directions and the good end was buoyed. The cable was lifted again in a similar manner on the other side of the fault and a new section of cable spliced in between the two points. This obviated the necessity of raising more than a short length of cable. Where mltiple faults occur or loss of shore ends prevents placing a tone on the cable it is quite conceivable that repairs will be impractical and complete or par- ‘tiel replacement necessary. 44 Section Wl