ie COMMANDER TASK UNIT SEVEN POINT THREE PCINT SIX U.S.S. LS¥ 250 c/o Fleet Fost Office San Francisco, California File No. CTUT.3.6/A9 ' «19 April 1948 Serial: 0018 Subse st: ' Report of Submarine Cable Operations. (con't) without paying out cable at an excessive speed. It was found necessary to run at speeds between 4.5 and 6 knots, whereas a laying speed of 3 knots is considered safer and more desireble. However nodamaze to the cable or the equipment resulted from the increased speed. (c) The use of LS¥'s for meking repairs or recovering cable previovsly laid did not prove too satisfactory. It was found impossible to maneuver the ships under prevailing wind conditions in such a marner that excessive strein was not placed on the cable during dragzing or recovery operations. The cable winch also lacks sufficient power to haul in 34 Section VII