Report of Submarine Cable Operations.
(con't)
Summary of Cable Laying Operations.
(2)
Actual cable operations were commenced on
5 January 1948.
The last submarine cable for
the AEC network was laid on 9 March and the underground connections thereto were completed on
' 17 March 1948.
All cables were tested, found to
be in good operating condition and turned over to
representatives of TG 7.1 on 17 ¥Varch 1948.
Tabu-
lated data covering the location, length and date
each cable was leid is contained in Enclosure (A).
(b)
This unit also assisted personnel of TG 7.1 in
‘laying and splicing Type RG-18 U coaxial cables on
Engebi, Aomon and Runit Islends as directed in
Paraggeph1.(b), (5), (11) and (12) of reference (a).
This work was completed on 25 March
29