CHAPTER V DEPENDENTS HOUSING ON ZNIVETOK Installation of partitions, roofing repair, screening and other carpenter work is proceeded apace on the conversion of the twelve family dwellings and, together with the interior painting, was completed 25 May 1948. The electrical wiring, to include the heavy jJuty service lines neeiled for the electric water heaters and kitchen ranges, coomnenced on the receipt of wiring and switch boxes 2O May 1943 and was completed before departure of the last of the Sandstone forces. The plumbing, a rather considerable installation, started on 20 ay 1948 with the arrival from Kwajalein of some of the materials and equipment required. Installation of lavatories and showers or renovation of the existing ones, was finished on 27 way 1948. roughing The in eleven toilets, with the accompanying drains and Navy cube sceptic tanks, is a considerable task carried on after the departure ot the Pickaway by fifteen plumbers ot the Army Task Group, and is expected to be completed before they leave Eniwetok by air 16 June 19:8. Seetion VIed: 10 wa:

Select target paragraph3