Photo Tower Triangulation Report way Pacific Southwest Region photo tower to the Zero points. The values are listed as computed from the control network and also from check computations based on observations made at the structure sites. This report is included. Adjusted Data Adjusting of the expanded scheme has been completed, and the adjusted values are included in this report. The value of the length of each line is independent of the route followed in the computation. All observations, inoluding the cheok observations at the structure sites, were evaluated and used in the adjustments. While this data varies from the values given in the photo tower triangulation report, the differences are small and assure that the values given in this report are within requirementa. In the interests of economy, these computations are not included in this report. The sketches included record the adjusted values determining the 2 cers Eh te Rahs 7 = at PF foes spepek te RL yt “fe pom me ” Reproduced from ¢h e-oldings of the National Archiy es A report was issued on May 18, 1951, inoluding the relation of the inter-relation of the various stations. The computations and field notes will be a part of the permanent survey reoords at the jobsite. i fiar fo?

Select target paragraph3