VSRTEL

Ve

On

LMovervor 1982, all cireraft in this element were equipped

with tho -PN.6,

The Intevrogetcr-Resrenser cguiprant (Merk X eystca) was
ste on eirereft $202

.

The lsck of group A items esssntial

the installetion, prevented esirsiional use of the

on

Lk e" Shot.

The arrival of cucup A itics enabled Lend
2
‘ip personnel to complete the Mark X instellaiicn in three aircreft , in
tine for "Hing™ Shot,

Cn this dste SA-16, 1016 ond SA-16, 1021, are still

Vecking op retienal rk X oyeten Peerus2 ef the Tite arrivel ef group B

itexs (2F5-31),

Atreraft 5295 (24-16) was £5% complete

wat stdll lecked the neccessary ridine

proximately 11,625 gallons,

installatica.

The total fuel concurption of the SB.29's

which participated in ‘the project was approximately 39,000 gallons,
4o

Aconsiderable emount of difficulty was encountered by this

organization in achieving its T.0, strength of four Sh16 type aircraft
in tine to utilize two aircraft on the project, while maintaining its
normal coimvitzent of two ships fer elert end stencty duty,
ca

2
2

BEST AVAILABLE C
opy