SECTION VI - v
SHIP AND BOAT REQUIREMENTS, PROJECT 2.63
Event
Station
Location
TIME
pegin Duration
No. of Proj.
Personnel
CHEROKR: Out to 30,10 Apr} Continuous
ZUNI
ni from
NAVAJO
TEVA
fall-out
area
FLATHEAD
do
&
;
ado
use
GZ in
Skiff
stations
Bikini
Lagoon
Wt & Cu of Proj
Remarks
.
Equipment
(including no. & type ship or boat}
Skiff's
unmanned.
150 lbs‘
10 cu ft
in each skiff
10 Apr] Continuous Crew - 8
n/a
Proj 2.62 -4
Proj 2.63 -%4
lu Apr
Barges un-
manned
|[16 skiffs and 2 spares will be
{furnished by Proj 2.63 and will be
|deep sea moored prior to CHSROKEL,
Data will be collected between
shots and cquipmentresot.
SIOUX assigned to this project for
skiff mooring and servicing. Full
tims use of this vessel will be
required.
Proj 2.63 equip} YFNB barges 13 and 29 are assigne
ment,
as collection platforms for Proj
2.63. To be towed into position,
repositioned between shots, and
anchored by TG 7.3.
do
do
do
do
Bikini
Lagoon
lu Apr] Continuous
Bikini
Occasional use
Bikini
Occasional use
Lagoon
Lagoon
Anchored
off NAN
After
}shot
,
Rafts unmanned
do
3 pontoon rafts to be towed into
position and anchored by TG 7.3.
n/a
n/a
Towing service to accomplish re-
n/a
n/a
LSU with crane, rigging and oper-
Proj 2.63,-5 to 15
Proj 2.65 -2
positioning of barges.
ating crew for occasional use.
YC barge to be used as packaging
station for Proj 2.63 and 2.65 in
case NAN is contaminated.