SECTION VI - v
SHIP AND BOAT REQUIREMENTS, PROJECT 2.63

Event

Station
Location

TIME
pegin Duration

No. of Proj.
Personnel

CHEROKR: Out to 30,10 Apr} Continuous
ZUNI

ni from

NAVAJO
TEVA

fall-out
area

FLATHEAD

do

&
;

ado

use

GZ in

Skiff

stations

Bikini

Lagoon

Wt & Cu of Proj
Remarks
.
Equipment
(including no. & type ship or boat}

Skiff's

unmanned.

150 lbs‘

10 cu ft

in each skiff

10 Apr] Continuous Crew - 8

n/a

Proj 2.62 -4

Proj 2.63 -%4
lu Apr

Barges un-

manned

|[16 skiffs and 2 spares will be

{furnished by Proj 2.63 and will be
|deep sea moored prior to CHSROKEL,

Data will be collected between
shots and cquipmentresot.

SIOUX assigned to this project for

skiff mooring and servicing. Full

tims use of this vessel will be
required.

Proj 2.63 equip} YFNB barges 13 and 29 are assigne

ment,

as collection platforms for Proj

2.63. To be towed into position,
repositioned between shots, and
anchored by TG 7.3.

do

do
do
do

Bikini
Lagoon

lu Apr] Continuous

Bikini

Occasional use

Bikini

Occasional use

Lagoon

Lagoon
Anchored
off NAN

After
}shot

,

Rafts unmanned

do

3 pontoon rafts to be towed into
position and anchored by TG 7.3.

n/a

n/a

Towing service to accomplish re-

n/a

n/a

LSU with crane, rigging and oper-

Proj 2.63,-5 to 15
Proj 2.65 -2

positioning of barges.

ating crew for occasional use.

YC barge to be used as packaging
station for Proj 2.63 and 2.65 in

case NAN is contaminated.

Select target paragraph3