The necessity of maintaining a capability for firing at both Bikini and
Eniwetok Atolls at the same time required that TU-7 provide two complete

the
ero
eduled
3 were
1ecesovided
for the

and independent rad-safe organizations.

ganizations was maintained by CTU-7.

Over-all control over the two or-

Each organization contained the fol-

lowing sections:
i
:
1.
Monitoring section for providing all monitoring services and man-

ning check points.

,

2. Plotting and briefing section for conducting all aerial surveys and
briefing all personnel going into radex areas.

uyerege 9"

nin
iming
sikini.
n the

Provide laboratory and technical assistance to all task groups.

Provide all official dosimetry services for JTF 7.

3.

Supply section for maintenance of rad-safe supplies, including

4.

Instrument repair section for maintenance of rad-safe instruments.

laundry (facilities furnished by TG 7.5).

5. Laboratory section for determining the amount of activity contained
in soil and water samples.
6. Decontamination section for operating facilities for personnel and
equipment decontamination.
Control over the official dosimetry and records section was maintained
directly by CTU-7. This was necessitated by the double badge system (permanent and mission film badges) that was used during the operation. A
small photodosimetry section was maintained at Bikini for processing mis-~
sion film badges used at that atoll. All permanent badges were processed
by the Eniwetok photodosimetry section. The master record file for all
personnel in JTF 7 was maintained at Eniwetok.

Personnel for manning TU-7 were obtained from the Army, Navy, and
Air Force, The majority of the personnel were obtained from the Army’s
lst Radiological’ Safety Support Unit, a Chemical Corps unit stationed at
Ft.McClellan, Alabama. The Armyprovided102officers and enlisted men;
the Navy 8 officers and enlisted men, and 30 civilians; and the Air Force
12 officers and enlisted men. Los Alamos Scientific Laboratory provided

four personnel in an advisory capacity.

Scientific projects in TG 7.1 and contractor personnel in TG 7.5 were

required to provide their own monitors for recovery and construction mis-

ited with
uirborne

sions. The majority of these personnel were trained by members of TU-7
at either Ft. McClellan, Alabama, or the PPG.

TG 17.6