TABLE :
REDWING SHOT SLHEDULE
(L = LASL, U = UCRL, E = Entwetok, B = Bikint)

Model! and

Laboratory

Shot

Name

Probable

Yie

nts

(2)

Location

Lacrosse
Cherokee

Runtt (E) ground
Namu (B) 5000 ft air burst

Zuni

Eninman (B) ground

Date

Actual

No
Yes

5/1
5/1

§/28

5/28

Yes

5/15

5/28
5/31
6/5

Flathead

South of Yurochi (B) barge

6/12

6°10

Runit (E) 700 ft air burst

6 i6

6/16

Mike craier, west oi

Yes

Datel5)

Actual (4)

Shot Time

5/1
5/1*

0625:05
O55!

5/8
5/23
5/26

6/1
5/23
5/28

5/8

0556

§/30

6/2

0626

6/7

6/i4

6/8
6/13
VA

0056
0606
0608,

6/7
5/18

6/22
6/22
3

No
No
Yes

5/1
ane
6/8

7/3

V8

Yes

Wfi

6/20

oso ~

South of Yurochl (B) barge
Halfway between Yurochi &

7/il
7/21

7/9
7/18

Yes
No

6/18
—

6,8
Ut

0556
0546

Mike crater (E) barge

1/22

1/2, 1/20

No

6/11

6/12

0616

Namuw (B) barge

6/22
6/26
3

Yea

(7)

67
6/18

0756
0615:05
1255:05

Yes
Yes

Teiteiripucchi (£) barge

6/12
6/14

Yes
No
No

Op Plan

6/12
6/14

Rujoru (E) 200 it tower
South of Yurochi (B) barge
Eberiru (E) 300 ft tower

&L-

(10/11/55)

4/29
5/9

$/28
§/31
6/6

Runit (E) 200 ft tower
Aomon (E) 300 {t tower

Revision"*)

5/5
5/21

Aomon (E) 200 ft tower
Runit (E) 200 ft tower
Bogon (E) ground

Blacidoot

Listed in

Fired Ready Date Concept(3)

Yuma
Erie
Seminole

0626
1126
1314

oposed Shots, Eventually Deleted from Schedule

-~

senna reer Se

Pawnee

Engebi (E) ground

---

o--

No

Pueblo

Bogairikk (E) ground

---

--+

Yes

---

wee

Runit (E) 100 it tower

one

o--

Yes

ee

ase

Runit (E) 100 ft tower

---

oes

Yes

ane

wee

Engebi (E) ground

---

ose

No

one

-+e!

Engebi (E) ground

-~-

---

No

Unspecified

a--

Unspecified

nee

Notes

Apache) was originally planned as a LASL model.
(2)

Probable yield limits, estimated before the shot, for construction, instrumentation, evacuation, aircraft positioning, fallout

prediction and other purposes.
(3) CTG 7.1 General Concept No. 1-55 (dated 4/12/55).
(4)
(5)

Later, by agreement between LASL and UCRL, it became a

orders were given.

First shot at each atoll was to be ready 4/15/56 bul no shot ;dates or

Ready dates in Revision No. 4 (dated 10/11/55) to CTG 7.1 General Concept No. 1-55.
CTG 7.1 Operation Plan No. 1-56 (dated 1/25/56). Later dates of UCRL small shots caused by December 1955 estimate of
UCRL that this program was a month behind schedule. Dates listed are from Revis on No. 2 to Op Plan (dated 2/4/56).
(6) Eniwe
(Zone-12) dates and times are use
e

‘n

postponed at H-3 min, 7/2/56f

Select target paragraph3