JOB 5 WORK ORDERS (Continued)
AEC

W,0,No.

Description

Date
Issued Site

User

4/26/51 Atoll D-3

Remove tunnel; clear entrance to Sta. 54. 4/26/51

NBS

963

Purchase misc. items in Honolulu.

4/26/51

NRLH

964

Make five aluminum trays.

4/27/51

965

Furnish 12 pieces of wood, 2% x 2% x 4'.

4/27/51

966

Furnish welder and equipment and crane,

4/27/51

967

Make seven 10' x 10! rafts,

1/27/51 D-V

J-3

968

Supply 12 pieces of plywood, 1/4" x

L/27/51

NBS

969

Relocate tent frame; perform electric

L/27/51

UCRL

970

Provide DUKW equipped for J-3 recovery
oper.

Lf27/51

J-3

971

Excavate path thru causeway; build sand
ramps,
;

4/27/51

J-3

972

Install control cable between tower and

4/27/51

UCRL

973

Fabricate 250 cage lids in sheet metal

1/27/51

SBN 2.4

974

Erect 16! x 321 tent at Station 144.

L/27/51

NRLK

975

Requisition for labor.

4/27/51

J-3

976

Furnish labor to assist in packing
excess gear.

1/27/51

NRLK

977

Prepare truck for overseas shipping.

5/28/51

Prog. 6.3

978

Perform misc, work on and around tower.

4/28/51

979

Drill 2 holes per brick in 32 lead bricks, 4/28/51

.

11/2" x 32",
work.

Sta, 135.
shop,

w

962

EG&G

wo

Prepare schematic diagram of atoll cable
system.

6.3

a

961

APG

NRLH

17-57

Select target paragraph3