JOB § WORK ORDERS (Continued)
AEC
W,0,No,

Description

Date
Issued

Site

User

943

Supply two electricians for Stas. 50 & 51.4/25/51 D-V NBS

944

Furnish labor to uncrate equipment.

4/25/51

B

NRLH

945

Perform various work at Station 6B.

4/25/51

E

NRLH

946

Locate & install 2 twenty-five foot wood
poles,

4/25/51

E

EG&G

947 *

Repair tops for fission fragment cameras. 4/25/51

B

J-3

948

Manufacture and deliver frames,

4/25/51

B

NBS

949

Install rope and wire guys on tower.

4/26/51

V

Prog. 1

Laborers for equip. install. & recovery

4/26/51

B

EG&G

951

Removal & relocation of vent pipes on

4/26/51 V R, Proj. 4.2

952

Supply 100 three ft. lengths of scrap

4/24/51

B

TU 3.1.5

953

Supply binding machine, wire & wire-

4/26/51

D

NBS

954

Place limon. blocks, batt. racks &

4/26/51

D

NBS

955

Modify telephone service.

4/26/51

B

Prog.1.10

956

Paint ten signs.

4/26/51

B

Proj. 6.3

957

Make misc. phone installations and

4/25/51

E

TU 3.1.5

958

Make wood platform with floor for J-3

4/26/51.

B

J-3

959

Cover Building 212A with tarpaulin.

4/26/51

B

J-3

960

Erect tent over 1000 yd. J-3 collimator.

4/26/51 V-D J-3

*

Supplement

950

17-56

work.

vaults.

pipe,

crimps.

remove tents,
--

connections,

pumphouse,

N C

- GYR

Select target paragraph3