JOB 5 WORK ORDERS (Continued)
AEC
W,0,No,

Description

Date
Issued Site

User

902

Remove tower cab sheeting; install canvas, 4/18/51

V

TU 3.1.1

903

Furnish one gasoline powered generator.

4/18/51

B

TU 3.1.5

904

Connect two lamps in Station 131.

4/18/51

V

UCRL

905

Requisition for labor.

4/19/51

D

NRLK

906

Cover J-3 cable with sand and sandbags.

4/19/51

E

J~3

907

Construct nine duckboards,

4/19/51

B

RAD~SAF

908

Repair safe in TU 3.1.7 office.

4/20/51

B

TW 3.1.7

909

Make up 75 four foot marking stakes.

4/20/51

B

TU 3.1.5

910

Furnish two pieces plywood.

4/21/51

B

NRLK

911

Install plywood partition with window

4/23/51

B

All Users

gl2

Remove pipe film holders; cut; reinstall. 4/23/51 BAS, NBS

913

Request for removal of photographic

4/23/51

914

Furnish labor & equip. to recover equip-

4/23/51 B,E

915

Provide generator and three laborers.

4/23/51

£E

916

Furnish 4 laborers and bulldozer and

4/23/51

C

917

Provide 8 tarpaulins for various stas.

4/23/51

D

NBS

918

Fabricate steel bench.

4/23/51

D

1.7

919

Remove air conditioning unit from

4/23/51

V

UCRL

920

Make ozalid prints of graphs.

4/23/51

B

D-5

921

Assign additional telephone circuits.

4/23/51

&

Prog. 3

922

Move or remove power lines or poles,

4/23/51

17-54

and ducts,

equipment.

ment,

operator,

station 132a,

Q

D

1.7

Select target paragraph3