JOB 5 WORK ORDERS (Continued)
AEC

W,0,No.

Description

Date

Issued

Site

_User__

808

Move desk & safe; make dark room in Bldg. 4/12/51

B

Prog. 1

g09

Install plywood sheets and paint.

4/12/51

B

JTF-3

810

Provide & install 4 window wind deflec-

4/12/51

B

JTF-3

811

Make twelve wooden plugs.

4/12/51

B

Proj. 6.1

812

Dig ditches around Stations 51 and 50.

4/12/51

D

NBS

813

Furnish one carpenter to work at control

4/12/51

B

3/12/51

B

NRLH

814

209,

tors,

tower,

Mfgr. one photomultiplier tube mount.

;

NRLH

815

Protect air cond., Sta. 6A, 6B; seal

4/12/51

B

NRLH

816

Make five lead discs.

4/12/51

B

UCRL

817

Make two 14 ft. extension cords with cube 4/12/51

B

NOBL

818

Install line & phones from Bldg. 323 to

4/12/51

B

TU 3.1.5

819

Make wood platform with solid floor for

4/12/51

E

820

Supply 30 ft. of suction hose w/connector 4/12/51

E

J-3

821

Furnish and install lock in Building 232. 4/12/51

B

NRLK

822

Surface area from Sta. 41 to waters edge, 4/11/51

S

3.1, 1.6,

823

Furnish lumber; install shielding.

4/12/51

E

NRLK

824

Brace batteries at Stations 54 and 57.

4/13/51 E

825

Wash down roof & side walls of Bldg. 232, 4/13/51

B

UCRL

826

Supply 28 pes. of plywood & 80 pes. of

B

UCRL

roof holes.

taps,

airstrip.

pumphouse,

lumber.

4/13/51.

4.2

NBS

17-49

Select target paragraph3