JOB 5 WORK ORDERS (Continued)
AEC

W,0,No.

Description

Date

Issued

Site

User

770

Install transformer; change electric

4/10/51

B

NRLH

771

Construct plywood extension on face of

4/10/51

Vo

UCRL

772

Scrub roof & sides of Building 212A,

4/10/51

B

J-3

773

Remove dies, gen., gas & oil; close

4/10/51

K

EG&G

77h

Erect tent with floor; place cots;

4/10/51

B

D3

7175

Cover Building 212A with tarpaulin.

4/10/51

B

J-3

776

Furnish 26 sheets of plywood.

4/10/51 L_

SBN 2,3

777

Remove sand cover at tunnel entrance to

4/10/51

C

NBS

778

Check one Ditto Duplicating Machine.

4/10/51

B

Ded

780

Furnish labor to SBN from 16 Apr. thru

4/10/51 L

SEN 2.3

781

Install lead, steel plate & sandbags at
Sta, 11.

4/10/51

E

1.5.2

782

Repair hinges on steel locker in Bldg.211.4/10/51

B

Proj. 5.1

4/10/51

B

TO 3.1.5

8B,P LASL,

service,

Sta, 131.

tower,

supply lumber.

Sta, 57.

7179

783

28 Apr.

Fabricate and letter signs.

784

Provide trunk line from Bldg. 310 to

4/10/51

785

Provide trunk line; modify phone cir-

4/10/51 B,E LASL,

786

Sandbag back of Station 132B.

4/10/51 E

787

Erect radar reflectors.

4/11/51 E,C Prog. 8

788

Drive twenty-five pipes into ground,

4/11/51 £,S

low tower.
cuits.

Prog.1.3
1.5.2

NRELK
NBS

17-47

Select target paragraph3