JOB 5 WORK ORDERS (Continued)
AEC
W,0.No,

Date

User

Site

750

Fabricate & install vent pipes in 22

4/9/51

751

Wash down Bldg. 212A with fire hose,

4/9/51

5-3

752

Move three fission cameras,

4/9/51

J-3

753

Construct windbreak & flies over colli-

4/9/51

J-3

75h

Move three new fission cameras.

4/9/51

J=-3

755

Move boiler plates on collimators from

4/9/51

J-3

756

Modify winch blast shield and bracing.

4/9/51

J=3

757

Modification and relocation of winch,

4/9/51

J-3

758

Dig holes for installation of storage
batteries,

4/7/51

SBN 2.3

759

Reproduce forty-five copies of chart.

4/9/51

JTF-3

760

Erect eight tents (ridge poles only;
no frames).

4/9/51

NRLH

761

Construct eight bins with shelves.

L/ /51

762

Repair typewriter,

4/9/51

ww

Issued

D-4
D-4

763

Disassemble aluminum structures.

4/9/51

TO

Description

764

Install.& wire vent for film lacquering

4/9/51

765

Concrete work & duckboards at Rad-Safe

4/9/51

RAD-SAF
3.1.5

766

Erect tent; clear airstrip of debris.

4/9/52

D-3

767

Furnish plywood sheets, disks and wiré.

4/10/52

NBS

768

Install a phone in the telemetering shack 4/10/51

Prog. 1.9

769

Fabricate and place pipe stakes.

NBS

17-46

mators,

C to E,

machine,
Bldg.

4/10/51

C

wo

vaults,

4.2

EG&G