JOB 5 WORK ORDERS (Continued)
AEC
W.O.No,

Description

Date
Issued

Site

User

690

Recharge one battery.

4/3/5L

B

Proj. 4.2

691

Hang door in Room A-13, Bldg. 209.

4/2/5L

B

De2

692

Move dural and steel racks at Sta, 624.

4/3/51

S

Proj. 6.2

693

Replace J-5 Office Tent with new tent.

4/3/51

3B

JTF3

694.

Pitch a l4' x14! tent with side frames.

4/3/51

B

Prog. 7

695

Furnish operator for Rad-Safe shower

4/3/51.

3B

RAD-SAF

pulp.

696

Maintenance for radio equipment.

4/3/51.

<A

Prog. 6.1

697

Construct pigeonhole sorting bin.

4/3/51

BB

Ded, TG 3.1

698

Install & maintain radio equipment.

4/3/51 B,E

699

Erect a barricade in coax cable trench.

4/3/51

E

700

Rout 40 masonite sheets,

4/3/51

UL

SBN 2.4

701

Move five lead shields.

4/3/51 C,E

SEN 2.4

702

Install two plywood bulletin boards,

4/4/51

B

TG 3,1

703 *

Furnish cherry picker operator.

L/4/5.

CC

J-3

704

Install light outside door of Bldg. 212A. 4/4/51

B

J-3

705

Install shielding in 200' tower.

4/4/51.

VV

NRLK

706

Fabricate two 9" x 3" copper cylinders,

4/4/51

B

UCRL

707

Mfgr. one stainless steel developing

4/4/5.

3B

NRLH

708

Furnish 12 pieces soft pine lumber.

L/4/5.

B

Prog. 1.7

709

Install slide bolt, staple, and hasp.

4/4/51

B

TG 3,1

710

Construct a brass overflow pipe.

4/4/51

B

TU 3.1.5

711

Manufacture three crank handles.

4/5/51

B

NBS

#

Supplement.

tray.

Prog. 3
UCRL

17-43

Select target paragraph3