JOB 5 WORK ORDERS (Continued)
AEC
W.0,No.

Description

Date
issued

Site
B

User

650

Install selector switch and bracket on

3/30/51

651

Furnish benches from theater at C to

3/27/51

Prog. 3

652

Connect gasoline drums to generators.

3/30/51

653

Install two lights in Gun Locker,

3/30/51

654

Recharge one battery,

3/30/51

655

Deliver two portable generators.

3/30/51

656

Move Station 174 to closest dry land.

3/30/51

657

Furnish material for permanent shelves,

3/30/51

658

Furnish carpenter to build shelves in

3/30/51

659

Machine two vacuum tank cover plates,

3/30/51

660

Furnish two carpenters to make relay

3/31/51

661

Chip concrete grouting.

3/29/51

662

Print signs on light weight cardboard.

3/31/51

663

Repair two Friden calculators.

3/31/51

664

Fabricate three steel plates.

3/31/51

665

Furnishand manufacture six tarps.

3/31/51

666

Install & wire fan; install door latches. 3/30/51

667

Construct two wooden camera carrying

3/31/51

EG & G

668

Furnish two plywood signs.

3/30/51

NRLK

669

Install EE-8 phone in Building 209.

3/31/51

D-3

670

Fabricate & weld steel plates & helmets,

3/31/51

racks,

WR
wo
wb

4.2

>}

ACC

sgqnmnene0oUo

EG & G
TU 3.1.5

ow

NRLK
UCRL

Gi

boxes,

JTIF-3

EG&G

ww

Sta, 14ib.

BG & G

NBS

nwnwo

USNS Mowrer.

NRDL

<i

phone.

Prog. 1

NRLK

D-3
TU 3.1.1

D=3

17-41

Select target paragraph3