JOB 5 WORK ORDERS (Continued)

AEC
W,0, No.

Date

issued _Site

Description

630

Mount eight blackboards in Bldg. 209.

631

User

. 3/29/51

B

TG 3.1

Make two light boxes for classification

3/29/51

B

TG 3.1

632

Furnish projector condensing lenses,

3/29/51

D-2

633

Fold up 10' aluminum angle; make 12

3/29/51

EG & G

634

Modify Air Operations Building.

3/26/51

TC 3.1,
TG 3.4

635

Survey two radar reflectors,

3/29/51

636

Miscellaneous electrical wiring.

3/29/51 V

NRLK

637

Provide cable pair.

3/29/51

JTF-3

638

Make cross connections & terminations.

3/29/51

JTF-3

639

Change extension on line 156 to ext. 157.

3/29/51

JTF-3

640

Supply 6 pieces of plywood.

3/30/51

J-3

641

Labor, equipment & material for misc.

3/30/51

TG 3.1
(8, 2B)

642

Haul 1/2 cubic yard of sand,

3/29/51

SEN 2.4

643

Remove fences around transformers.

3/29/51

All Users

644

Dispose of Pylons and Structures.

3/29/51

8.2

645

Furnish lumber to build shelves.

3/29/51

646

Furnish one carpenter to block up

3/30/51

NOEL

647

Weld camera mount component.

3/30/51

EG&G

648

Drill & open safe; make repairs & repaint, 3/30/51

649

Purchase 100 lbs. 1/8" Silfoss silver

17-40

of film.

brackets,

work,

batteries,

solder.

C,D,

K,M
B

Prog. 8

3.1.5

B

3/30/51 V,E

D-3
NRLK

Select target paragraph3