JOB 5 WORK ORDERS (Continued)
AEC

W,0.,No,

Description

Date
Issued

Site

User

609

Labor and material for coax project.

3/26/51

E

NRLK

610

Provide two direct lines with BE-8 Phones, 3/27/51

B

Prog. 1

611

Fabricate 2 pieces of plywood; provide
6 stakes,

3/27/51

8.2B

612

Chart made by Engineering section,

3/28/51

D—5

613

Furnish extension off MP phone to wooden

3/27/51

NRLH

614

Ozalid 12 copies of graph.

3/28/51

D-5

615

Construct

3/27/51

TU 3.1.5

616

Construct box for film dryer.

3/28/51

NOEL

617

Extend two rods.

3/27/51

JTF-3

618

Insert lead disks.

3/28/51

NBS

619

Drive eight 2 1/2" pipes.

3/28/51

NBS

Make test placement of inner doors.

3/28/51

NBS

621

Drill four holes in limonite.

3/28/51

NRLK

622

Furnish telephone pair for telemetering.

3/28/51

Prog. 1

623

Machine work on gasket face,

3/28/51

UCHL

624

Construct temporary plywood doors.

3/28/51

UCRL

625

Machineexpansion engine valve stem,

3/28/51

626

Two photo. auto. adjustable enlarging

3/29/51

TU 3.1.6

627

Provide 1 3-dimensional Radex Plotting

3/24/51

JTF-3

628

Furnish plywood, stove bolts & misc.tools, 3/28/51

JTF-3

629

Furnish stripping on panels in Conference 3/28/51

JTF~3

. 620

tower,

five wooden dosimeter racks.

easels,
Device,

Room,

17-39

Select target paragraph3