JOB 5 WORK ORDERS (Continued)
AEC

W,0,No,

Date

Description

Issued

Site

589

Furnish services of clerk-secretary.

3/26/51

B

TG 3.1

590 *

Install chain link fence w/gate and lock. 3/26/51

B

TG 3.1

591

Install electric lamps in two calculators, 3/26/51

B

NBS

592

Remove & store windows and frames.

3/26/51

T

Proj. 3.5

593

Cut I beams, erect tent, & smooth black

3/26/51

E

3.1, 1.6,

594

Supply plywood and standard iron pipe.

3/26/51

B

NBS

595

Paint three signs,

3/26/51

B

Da2

596

Straighten and weld SK-Antenna.

3/27/51

B

NOBL

597

Make connections to allocate telephone

3/27/51 E,D, TU 3.1.5

598

Supply electrical materials.

3/26/51

B

JTF.3

599

Put piles of dirt along cable line,

3/27/51

C

J-3

600 *

Install magnetic switches w/push button,

3/27/51 Tow All Users
er

601

Cut stencils for alphabet and numbers.

3/27/51

L

602

Miscellaneous mechanical work.

3/27/51

B

603

Install lighte in covers of 20 calcula-

3/24/51

B

TU 3.1.1

604

Make post-shot residual strength test

3/27/51

E

3.3.8

605

Make post-shot strength test on pre-cast

3/27/51

S

3.3.4

606

Furnish a direct line.

3/ /51 A,B

607

Purchase 30 large bottles Prestolite.

3/27/51 Various NRLK

608

Manufacture and install 24 feet of duct.

3/27/51

*

Supplements

17-38

top.

pairs.

tors.

on columns.
concrete,

User

4,2

C

V

SBN 2,3

UCRL

TG 3.1,D-3

NRLK

Select target paragraph3