JOB 5 WORK ORDERS (Continued)
AEC

W,0,No.

Description

Date

Issued

Site

User

567

Install two blackboards,

3/22/51

B

568

Mfgr. plywood container for transmisso-

3/22/51

B

569

Construct wood stand & secure to top of

3/23/51

E

570

Weld two 55 gallon drums together.

3/23/51

E

Proj.6.10

571

Dig hole near concrete shelter 3.1.3,

3/23/51

EB

Proj.6.10

572

Construct small watertight box.

3/23/51

B

J-3

573

Panel or plank area on So. end of Bldgs.

3/23/51

B

CMR

574

Furnish lumber.

3/23/51

B

5.1

575

Place reference points.

3/23/51 C8, Prog. 1

576

Four ozalid copies of report.

3/23/51.

B

G&G

577

Fabricate rack.

3/23/51

B

CMR

578

Furpish one piece of brass.

3/24/51.

V

NRLK

579

Install light with reflector.

3/24/51

B

De2

580

Install ten telephones in Bldg. 221.

3/24/51

B

JTF=3

581

Place marstien matting on the north beach. 3/24/51

T

Prog. 2

582

Reface and regroove gasket plate.

3/24/51

V

583

Design timbering and make sand fill.

3/26/51 E,C NBS

584

Furnish labor to build collimating walls. 3/24/51 V

585

Mfgr. & deliver partitions for Bldg. 222. 3/22/51

B

JTF-3

586

Repair eight typewriters,

3/26/51

B

Ded

587

Drill & open safe file; make repairs.

3/26/51

B

D2

588

Repair Friden Calculator.

3/26/51 B

meter,
vault.

329 & 330.

TU 3.1.1
NRLH
Prog. 7

UCRL

NRLK

NOBL
17-37

Select target paragraph3