JOB 5 WORK ORDERS (Continued)
AEC

W,O.No.

Description

Date

Issued

Site

User

528

Construct power outlet shelter on Sta,
13la,

3/20/51

V

UCRL

529

Mfgr. inner conductor connectors for

3/20/51

V

NRLK

530

Eliminate light leaks around darkroom

3/19/51

E

1.5.2

531

Increase fuse capacity in power lines.

3/20/51 P,Q AMC

532

Weld boiler plates.

3/20/51

E

1.5.2

533

Furnish two 6 volt storage batteries,

3/20/51

B

NRLH

534

Connect M-B-100 diffusion pumps.

3/20/51

Vo

UCRL

535

Provide assistance to line collimators.

3/20/51

V

LASL

536

Furnish 24 pieces of 1/2" plywood,

3/20/51

B

NBS

537

Stabilize a road,

3/20/51

B

All Users

538

Construct tent & frame, & photo projec-

3/19/51

B

539

Remove casters from 2 dollies & weld on
2 racks,

3/20/51

C

NBS

540

Assemble & install 2 vacuum frame fume

3/20/51

B

CMR

541

Construct ‘one reflector frame.

3/21/51

B

542

Furnish one EE8 field phone,

3/21/51

K

EG&G

543

Furnish laborers to open boxes.

3/21/51

V

NRLK

5L4

Construct airlock at entrance to

3/21/51

B

LASL

545

Furnish labor & forklift to store

3/21/51

V

LASL

546

Construct four hot lockers in Bldg. 211.

3/21/51

B

D3

547

Erect and supply tent & tent frame,

3/21/51

B

EG&G

coax cable,

door,

tor stand,

hoods.

Bldg. 212A,
rockets,

UCRL

NOBL

17-35

Select target paragraph3