JOB 5 WORK ORDERS (Continued)
AEC
W.0, No,

Description

Date
Issued

Site

User

234

Furnish three pieces of plywood.

2/24/51

B D3

235

Remove partition between Rms, A-5 &
A-9, Bldg. 209.

2/24/51

B D3

236

Supply varnish and paint.

2/24/51

L MBD-BIO

237

Furnish 4 laborers and 2 carpenters
for misc, work.

2/24/51 E,V NRLK

238

Make nine box handling hooks.

2/24/51

239

Fabrication of one set "Box Hooks",

2/ /5l1 B

DA

240

Furnish 1 cherry-picker crane operator

2/26/51

Prog. 2

241

Install and maintain misc. radios

2/26/51 B,C RAD-SAF

242

Furnish one electric arc-welding rig.

2/26/51 S,Q, Proj. 8.2

243

Dig five holes and pour concrete.

2/26/51 E,S, Proj. 8.2

244

Furnish & set up one 14' x 14! tent

2/26/51 C,E, NRLH

245

Mfgr. & paint tables; mfgr. & install

2/24/51 B

JTF=3

246

One truck & two laborers to pick up
empty boxes.

2/26/51

B

Ded,
TG 3.1

247

Construct four "A" frames for vehicles,

2/26/51

B

Ded

248

Sheet metal repair-photocell containers. 2/27/51

B

NRLH

249

Furnish necessary labor & equipment.

2/27/51

B

LASL

250

Survey measurement.

2/27/51

B

251

Provide tent flies; furnish labor

2/27/51 E,V 3.1.1.8

17-20

for 1 day.

and antenna,

with frame.
signs,

for misc. work.

B

L

3.1.1.8

P

Prog. 8
Gen

Select target paragraph3