JOB 5 WORK ORDERS (Continued)
AEC
WO, No,

Date

123

Supply 5 pes, bar steel, 10 pes. round
steel rod,

2/12/51 B

4.1

124

Drill 8 holes in 108 4" pipe flanges.

2/12/51 B

Prog. 4.1

125

Request for 100 board feet of lumber.

2/13/51

>

User

D-4

126

Increase depth of holes.

2/13/51

E

Prog. 4.2

127

Furnish 48 lag bolts with washers.

2/13/51

iB

D-4

128

Furnish one crane from 16 Feb. thru

2/13/51 E,S Proj. 8.2

129

One 14' x 14' tent near Station 335A,

2/13/51 E

130

Miscellaneous radio maintenance,

2/13/51 B

131

Manufacture one incinerator.

2/12/51

132

Manufacture and install one outgoing
mail box.

2/12/51 B

133

Miscellaneous radio installation &

2/ /51

B

134

Adjustment & maintenance of 12 SCR

2/ /51

B

135

Miscellaneous radio installation &

2/13/51 Misc.Med Bio

136

Install plumbing, cooling system, &

2/14/51

B

137

Install pierceway with 4 to 6 outlets.

2/14/51

B

138

Put new top cover on small folding

2/14/51

B

139

Hang 2 mirrors, place 1 paper towel

2/13/51 B

TU 3.1.5

140

Construct one table

2/13/51

w

issued Site_

TU 3.1.5

141

Construct two tables,

2/13/51

wow

Description

TU 3.1.5

17-14

3 March,

maintenance,

300 sets.

maintenance,

chimney-pipe.

table.

dispenser.

B

NRLH

3.1.6

Prog. 1

Select target paragraph3