JOB 5 WORK ORDERS (Continued)
AEC

W,0, No,

Description

Date

Issued Site

User

NBS

104

Requisition for labor, material and

2/9/51

C

105

Paint and install two signs.

2/9/51

3B

NOBL

106

Construct and install shelf and rack.

2/9/51

B

NOBL

107

Install relay on receptable circuits

2/9/51

B

LASL

108

Install power in Station 133.

2/10/51

E

UCRL

109

Manufacture mail distribution box.

2/8/51

B

JTF-3

110

Make & install table shelf & 6 book

2/7/5.

B

JTF-3

111

Repair typewriters.

2/10/51

L

Med-Bio

112

Construct four lockers of plywood.

2/10/51

B

NRLK

113

Install add. shelving & socket type

2/10/51

B

NRLK

114

Erect 14' x 28! tent over vault.

2/10/51

E

NBS

115

Install temporary field wire, and

2/10/51

E

NBS

116

Install temporary field wire, and

2/10/51

C

NBS

117

Erect fourtents, 16' x 32',

2/12/51 E,V NRLK

118

Manufacture one spring tension gauge.

2/10/51

119

Erect work benches; make dry boxes

2/10/51 E,D UCRL

120

Pour cement pad; erect work bench,

2/10/51 E,V, UCRL

121

Make bench; install outlets; stabilize floor.

2/12/51

E

NOBL

122

Manufacture three sheet metal

2/12/51

B

JTF-3

services,

in Bldg. 212A,

shelves.

outlets,

telephone,

telephone,

and shelves,

dry box, shelf.

messages trays,

B

NRLK

D