10,

Connected circuits for TG-3.2 (Building No. 15) on Eniwetok
with JTF-3 (Building No, 221) on Parry,

ll.

Installed special public address system at the Officer's Beach
Club on Parry and made connections to wire cable pairs to the
Officer's Beach Club on Eniwetok for timing circuits and loudspeakers to furnish information to personnel at each shot time.

12,

Connected weather circuits fran Air Operations Center on Eniwetok to Control Building No. 311, Command Post, Operations
Center, TG-3,1 on Parry, and the USS CURTISS.

13.

Furnished cable pairs and wired circuits used for a radio backup of all telephone trunking and teletype lines between the

telephone office and the Cammmications Center (Building No, 221,
on Parry).

Regular telephone equipment was tied into the AM/

TRC for use in emergency such as damage to submarine cable,

(no such emergency occurred).

Connected about 35 spectal circuits from Control Building No,
311 on Parry to other sites,
15.

Reinstalled telephone service after each shot. The reinstallation between the first shot on Engebi and the E-Plus shot
included 20 telephones and two 10-pair cables between Station

No. 69 and the top and base of the E-plus tower for telemetering and for private lines direct to Parry.

Table 16.3-1 shows telephone installations by months for each site.
TABLE 16,3-1, TELEPHONE INSTALLATIONS
Aomon

Date
1950
2 July
30 July

2 Sept.

30 Sept.
31 Oct.
30 Nov.

31 Dec,
1951

31 Jan.

20 Feb.
31 Mar.
30 Apr.

30 May

16-14

Parry
_-

Runit

Biijiri
Rojoa

30
80

oe
---

---—-

110
141
141

2
3
7

95

2

162

g

185

13

214
eld
300

150

28
28
5

2

Engebi

Japtan

--4

2
2

3
6
7

12
12
12

6
6
6

16

35

2

5

2

12

a4
36
54

12

35

73
73
30

6

6

6

9
9
8

3

Select target paragraph3