JOB 5 WORK ORDERS (Continued)
AEC
W,0,No.
Description
Date
Issued
Site
User
770
Install transformer; change electric
4/10/51
B
NRLH
771
Construct plywood extension on face of
4/10/51
Vo
UCRL
772
Scrub roof & sides of Building 212A,
4/10/51
B
J-3
773
Remove dies, gen., gas & oil; close
4/10/51
K
EG&G
77h
Erect tent with floor; place cots;
4/10/51
B
D3
7175
Cover Building 212A with tarpaulin.
4/10/51
B
J-3
776
Furnish 26 sheets of plywood.
4/10/51 L_
SBN 2,3
777
Remove sand cover at tunnel entrance to
4/10/51
C
NBS
778
Check one Ditto Duplicating Machine.
4/10/51
B
Ded
780
Furnish labor to SBN from 16 Apr. thru
4/10/51 L
SEN 2.3
781
Install lead, steel plate & sandbags at
Sta, 11.
4/10/51
E
1.5.2
782
Repair hinges on steel locker in Bldg.211.4/10/51
B
Proj. 5.1
4/10/51
B
TO 3.1.5
8B,P LASL,
service,
Sta, 131.
tower,
supply lumber.
Sta, 57.
7179
783
28 Apr.
Fabricate and letter signs.
784
Provide trunk line from Bldg. 310 to
4/10/51
785
Provide trunk line; modify phone cir-
4/10/51 B,E LASL,
786
Sandbag back of Station 132B.
4/10/51 E
787
Erect radar reflectors.
4/11/51 E,C Prog. 8
788
Drive twenty-five pipes into ground,
4/11/51 £,S
low tower.
cuits.
Prog.1.3
1.5.2
NRELK
NBS
17-47