JOB 5 WORK ORDERS (Continued)
AEC
W,0, No.
Date
issued _Site
Description
630
Mount eight blackboards in Bldg. 209.
631
User
. 3/29/51
B
TG 3.1
Make two light boxes for classification
3/29/51
B
TG 3.1
632
Furnish projector condensing lenses,
3/29/51
D-2
633
Fold up 10' aluminum angle; make 12
3/29/51
EG & G
634
Modify Air Operations Building.
3/26/51
TC 3.1,
TG 3.4
635
Survey two radar reflectors,
3/29/51
636
Miscellaneous electrical wiring.
3/29/51 V
NRLK
637
Provide cable pair.
3/29/51
JTF-3
638
Make cross connections & terminations.
3/29/51
JTF-3
639
Change extension on line 156 to ext. 157.
3/29/51
JTF-3
640
Supply 6 pieces of plywood.
3/30/51
J-3
641
Labor, equipment & material for misc.
3/30/51
TG 3.1
(8, 2B)
642
Haul 1/2 cubic yard of sand,
3/29/51
SEN 2.4
643
Remove fences around transformers.
3/29/51
All Users
644
Dispose of Pylons and Structures.
3/29/51
8.2
645
Furnish lumber to build shelves.
3/29/51
646
Furnish one carpenter to block up
3/30/51
NOEL
647
Weld camera mount component.
3/30/51
EG&G
648
Drill & open safe; make repairs & repaint, 3/30/51
649
Purchase 100 lbs. 1/8" Silfoss silver
17-40
of film.
brackets,
work,
batteries,
solder.
C,D,
K,M
B
Prog. 8
3.1.5
B
3/30/51 V,E
D-3
NRLK