JOB 5 WORK ORDERS (Continued)
AEC
.
W.0,No,
Description
Date
Issued
Site
User
394
Perform necessary wiring for safelights.
3/12/51
B
TU. 3.1.5
395
Construct supports & deliver to Bldg.2ll. 3/13/51
B
JTF-3
396
Straighten frame for Corona Shroud.
3/13/51
B
UCRL
397
Furnish & connect fire hose with nozzle,
3/13/51
C
T.G.
398
Connect wire grip to wire rope.
3/13/51
B 1T,.G.3.1.5.1
399
Supply dynamite & technician for
3/13/51
C
NOBEL
400
Dig narrow ditch from 301J to camera
3/12/51
E
Prog. 3.4
401
Erect & position reflectors on tele-
3/13/51
C,
EG&G
402
Change power system in 212A.
3/13/51
B
Group J-3
403
Install air conditioning unit in
2/27/51
B
1.5.1
404
Furnish crane & operator to lift vaults.
3/13/51 C,E Proj. 4.2
405
Supply paper drinking cups to 3.1 Whse.
3/13/51
B
406
Manufacture one stainless steel tray.
3/13/51
B
NRLH
407
Install &maintain communications set
3/14/51
B
CTG 3.1,
408
Provide labor to place equipment.
3/14/51
E
409
Furnish locksmith to open file safe
3/14/5L B
TU 3.1.6
410
Repair typewriter & return to Bldg. 211.
3/14/51
B
NOEL
411 *
Install wiring & communication equipment 3/14/51
B
Prog. 1
412
Misc, location surveys of sci. stations,
C,
amTCU
Sta, 18.
instruction,
stations.
phone poles,
Building 212A.
and antenna.
in Bldg. 210,
Supplements
17-28
3/14/51
D,E
V,E
;
3.1.5.1
All Users
D-3
NOBEL
3.4.3