JOB 5 WORK ORDERS (Continued)
AEC
WO, No,
Description
Date
Issued Site
User
215
Build an A frame; build one "hot" cabinst.2/22/51
V
NRLK
216
Erect telephone relay racks in Stas, 132 2/22/51
E
NRLK
217
Establish wiring freeway in 4-inch pipe. 2/23/51
E
LASL
218
Move 4 boxes from tower area to Sta.132. 2/23/51
E
NRLK
219
Requisition for the services of a crane, 2/23/51 E,S,
Proj. 8.2
220
Repair costumer - Reattach leg of tree.
2/23/51
B
JTF-3
221
Construct and paint one rack.
2/23/51
B
D3
222
Furnish labor to open, empty, reassemble
2/23/51
E
UCRL
223
Erect one 14' x 14! tent with hot
2/23/51 B
NRLE
224
Rewire lighting in office & lab; change
2/23/51
225
Furnish labor to stretch 100,000 feet
of cable,
2/23/51 E,D
226
Supply one generator for auxiliary
power,
2/23/51
227
Construct four incinerators.
2/24/51 B
All Users
228
Furnish carpenter to build target
2/24/51
E
NRLK
229
Furnish one welder for four days work.
2/24/51
E
AMC
230
Remove two secondary poles as an
2/23/51
B
231
Install buckets inside of doors in
2/24/51 C,E NBS
232
Manufacture 300 flanges for 7/8 cable,
2/23/51
233
Run pipe from tank to tent; attach
2/24/51
and 141,
Q,P
boxes.
locker,
outlet.
at Sta, 132d.
obstruction,
Stas. 54 & 57.
pump.
B
V
NRLH
NRLK
NRLK
NRLH
NRLK
V
NRLK
17-19