JOB 5 WORK ORDERS (Continued)
AEC
W.0. No.
Description
Date
Issued Site
159
Mfgr. & install cabinets, locking bars,
2/15/51
160
Install airstrip lighting & wind socks.
2/16/51 B,E
All Users
161
Install plywood in Rms. A-5, A-9, A-ll,
2/16/51
B
D-3
162
Deliver 4 14' x 14! wall tents to
2/23/51
E
Proj. 8.2
163
Mount 2 stud bolts on outside wall of
164
Provide wood table in entrance of
hasps.
Bldg. 209.
E Warehouse.
Bldg. 69
Bldg. 69
B
User
JTF-3
| 2/17/51 C,D, TU 3.1.5
E
2/17/51 C,D
RAD-SAF
RAD~SAF
E
165
Construct one heavy duty table.
2/16/51
B
NRLH
166
Construct 5 pes.rough wooden shelving.
2/16/51
E
NRLK
167
Furnish & install tent outside of
2/16/51
B
168
Construct 2 lab benches; install outlets, 2/17/51
E
Prog. 6.3
169
Install temporary outlet in Bldg. 119c.
2/17/51
A
NRLH
170
Miscellaneous surveying.
2/17/51
B
NRLH
171
Overhaul electric motors to vacuum
2/17/51
C
NBS
172
Construct and install blackboards and
runner,
2/10/51
B
TG 3.1
173
Install telephones in Tent #66 & Sta.
134.
2/17/51
E
UCRL
174
Deliver lumber to Station 53,
2/17/51
C
NBS
175
Construct two shelves & blackboard
2/17/51
B
NBS
176
Locate & dig cable ditches; assist in
2/17/51 E,D, NOBL
V
17-16
Bldg. 211.
pumps. -
in Bldg. 211.
laying.