JOB 5 WORK ORDERS (Continued)
AEC
W.0, No,
Description
Date
Issued Site
User
24
Perform necessary alterations to three
1/17/51 ALL
All Users
25
Repair typewriter,
1/18/51
B
JTF-3
26
Requisition of plywood.
1/22/51
B
AMC
27
Requisition for piece of pipe.
1/22/51
B
Proj. 4.2
28
Perform alterations in Fire Station Bldg.1/22/51
B
D-2
29
Fabricate film tank, frame, and reels.
1/24/51
B
D-2
30
Activate one each 24V Exide Aircraft
1/25/51
B
Proj. 4.2
LOM ts,
Battery.
.s
31
32
Metal work on Stations 121 A-E,
1/25/51 E,V J-10
33
Material Requisition
1/25/51
B
Proj. 4.2
34
Regrind points for Whittemore gauge.
/1/25/51
E
Sandia
35
Electrical work - Building 335a.
1/25/51
E
3.4
36
Make 12 signs,"DANGER HIGH VOLTAGE".
1/25/51 ALL NBS
37
Place markers in tower and at ground
1/25/51 E,V, All Users
38
Machine one stainless steel connector,
1/29/51
39
Relocate exhaust ventilation in Sta-
1/25/51 £,C
40
Move eight limonite concrete blocks
1/25/51 E,C LASL
4l
Provide material and construct four
1/27/51
Determine extent Stations 52 & 53 are
1/30/51 C,E NBS
zero,
tions 54.
from E to C,
"A" frames,
C
B
B
4.2
NBS
Des
42
43
settling.
17-9