CHAPTER Ii, SECTION 1

é

STAT. §81.03
CORE SAMPLE TAkE

gh

BETWEEN

t

S's /qr

DiAco
tos
‘AC
ONALLY. SPLir

oN RECOVERY

82 Op

~

PRUJLOT

(Neg. No. W-V-46-12)

Figure No. 2-10. Concrete Slump Test for
Bldg. 430 — Elmer.

(Neg. No. W-V-246-7)

Figure No. 2-11. Core Samples for
Ground Motion Studies.

i

(Neg. No. W-849-2)

Figure No. 2-12.

Asphalt Pavement Check — Fred Airstrip.
Page 53

Select target paragraph3