CHAPTER I, SECTION 4 (Neg. No. W-877-7) Figure No. 1-16. Barge Slip at Nan Showing Gate in Place, 75% Complete. (Neg. No. W-V-94-4) Figure No. 1-17. Page 40 Pouring Concrete at Station 1312 — 30% Complete.
CHAPTER I, SECTION 4 (Neg. No. W-877-7) Figure No. 1-16. Barge Slip at Nan Showing Gate in Place, 75% Complete. (Neg. No. W-V-94-4) Figure No. 1-17. Page 40 Pouring Concrete at Station 1312 — 30% Complete.