CHAPTER II, SECTION 6

SECTION 6
COMMUNICATIONS
GENERAL.
Prior to Operation HARDTACK, communications facilities, with the exception of certain DOD systems, were handled by H&N and
other Contractors; a considerable portion of the
equipment wasleased for each Operation. Severe
coordination and orientation problems existed

under this arrangement. To achieve increased
efficiency and improved operational results at

reduced cost, AEC adopted a policy of establishing permanent communications facilities and assigning the responsibility for all aspects of the
systems to a single Contractor. HEN was designated as Contractor to assume responsibility
for all aspects of the TG 7.5 Communications

System covering the following:
1.

Qa nk w

2.

Evaluation of AEC directives and User

requirements in terms of facilities and
systems.

Engineering design and preparation of
specifications and plans.
Equipment procurement.

the Contractor, using equipment furnished by

the military services.

Radio interference detection was a new responsibility during this Operation. Teams were

maintained at Eniwetok, Bikini, and Johnston
Island. Recreation facilities, such as the tele-

vision station, the motion picture theaters, and
the TG 7.5 amateur radio stations, were oper-

ated and maintained by the Contractor. Com-

munications circuits to Honolulu and Kwajalein

were maintained by the Military, but traffic
over these circuits was controlled by the Contractor’s telephone operators. All TG 7.1 and

TG 7.5 teletype traffic within EPG, or between

the EPG and Honolulu and Continental U.S.,

was sent and received by the Contractor-operated Communication Centers. Technical assis- tance in the repair and fabrication of electronic

devices and communications equipment was furnished the Scientific and Military groups.

A Communications Engineering Project
Group was formed in the Los Angeles Engineering Office and staffed with engineering specialists

Operation of the systems.

in both radio and telephone. This group was
responsible for general project coordination and
engineering direction. Among the many functions

Technical assistance to Scientific and
Military groups, as required.

ration and issuance of detailed plans and speci-

Installation and maintenance.

New major facilities, together with a general expansion of existing wire and radio instal-

lations within EPG, materially increased the

Contractor’s communications responsibilities for

performed were (a) liaison with AEC Communications Representatives and Users; (b) prepa-

fications for components and systems; (c) provision of technical guidance and recommenda- .
tions to procurement groups; (d) preparation
of test procedures for field installation; and (e)
field surveys and tests.

Operation HARDTACK.Theinter-atoll Tropospheric Scatter System, three automatic dial
telephone exchanges, and the scientific VHF FM
networks were commissioned for this Operation.

‘cruiting effort was made to secure skilled per-

cations services for land areas within the Prov-

radio and telephone electricians and telephone
and teletype operators. Staffing was scheduled
on the basis of equipment and circuit operational

operated communications plants on Sites Fred

of 122 personnel on 5 April 1958, during the

the USS BOXER, the USS AINSWORTH, and

with the operational phase approximately 75%
complete, the Division staff had been reduced
to 99 men. The Division was divided into two

The scope of the Contractor’s responsibilities
included the engineering, installation, and operation of all radio and telephone communiing Ground, with the exception of the military-

and David. The Contractor was also responsible
for the ship-to-shore UHF facilities integrating
the various smaller naval vessels into the general

EPG telephone system. The inter-atoll Tropo-

spheric Scatter System connected the telephone

systems at each atoll. The DODscientific nets,
the TG 7.5 boat pool nets, the TG 7.5 air dispatch nets, and the Contractor’s guard depart-

ment net were all installed and maintained by

A Communications Division was created at

Jobsite on 2 September 1957. An intensive re-

sonnel to augment the interim period cadre of

deadlines, with Division strength at its peak

closing phase of the build-up period. On 5 July,

Departments: Installation-Maintenance and Operations. The Installation-Maintenance Department included radio stations, radio shops, and
telephone shops at Elmer and Nan; in addition,

a teletype shop and a dial exchange maintenance
section were located at Elmer. The Operations