CHAPTER II, SECTION 3
STATION:
1210.02
SITE:
Yvonne
USER:
LASL
PURPOSE:
Pinhole Station
PARTICIPATION: 20
DESIGN PSI:
None
CONSTRUCTION: 1-6-58/4-20-58
Station
1210.02 was a Pinhole
Station
located at the north end of Yvonne near Station
20. This station was oriented in alignment with
Shot Station 20, Vacuum Pipeline Station 1217,
and Pinex Station 1216. This structure was of
reinforced concrete construction, 14x13 feet in
overall plan, consisting of a 3-foot-thick foundation slab with 3-foot-thick perimeter walls 6
feet high. The single floor space was 8x7 feet
in plan. The station was earth-barricaded to
the top of wall Elevation ~ 13.0. The structure
contained only electrical outlet receptacles and
8-inch pipe sleeves in the walls in line with
the orientation previously described. A canvas
cover was provided to protect the room area
from the weather.
shaped access space to the slot from outside
grade.
STATION:
1211
SITE:
Irene
USER:
LASL
PURPOSE:
Pinex Recovery
PARTICIPATION: 21
DESIGN PSI:
(Neg. No. W-V-260-5)
Figure No. 2-40. Stations 1211 and 1410
Ready for Backfill.
80 psi
CONSTRUCTION: 1-29-58 /4-26-58
A 36-inch ID pipe projected from Station
1211 through the rear wall on line with the
Vacuum Pipeline. A 6-inch support framework
detail was situated in the station room space,
centered, and aligned with the recovery slot.
The User was furnished 6000 feet of 1-inch
steel cable, sockets, and a concrete anchor
block and marker buoy connected to the User’s
sample block. Power was supplied from Station
1525.
STATIONS:
1212.01 and 1212.02
SITE:
Gene-Helen-Irene
USER:
LASL
ure also provided one other room space for
PURPOSE:
Vacuum Pipeline
ure was 22x5414 feet in plan with a projected
PARTICIPATION: 21
Pinex Recovery Station 1211 was situated in a room space of a reinforced concrete
structure located at the-Irene terminal end of
Vacuum Pipeline, Station 1212.02. The StructPhonex Measurement, Station 1410. The struct-
area on one side 15-1/6x3\4 feet and a pair of
slot walls and wing walls projecting off the
opposite side adjoining the Station 1211 room.
Enclosing exterior walls were 3 and 414 feet
thick, and interior walls were 3 feet thick.
The structure was earth-barricaded on all
sides and had a 5-foot fill over the roof slab.
Permanent access to the structure was by a
concrete tunnel passage through earth-fill at
the rear of the structure. The two projecting
access slot walls for sample recovery from outside the structure were 2 feet thick and 4 feet
high. The slot and walls terminated at a re-
taining wall face 11 feet from the outside wall
line of the main structure with somefill against
the retaining wall section to form a trough-
Page 94
DESIGN PSI:
None
CONSTRUCTION: 1-14-58/4-12-58
Stations 1212.01 and 1212.02 were vacuum
pipelines located on the ocean reef off Sites
Gene, Helen, and Irene; short runs of pipeline
were on land at Gene and across the man-made
island off Site Helen, and a long length of pipeline was on Site Irene. The pipelines were aligned between the work points of Station 21,
Gene, and Station 1211, Irene. The centerline
of pipe elevation was on a true horizontal level
between the Station 21 and Station 1211 work
points at Elevation + 10.00 feet.