CHAPTER Il, SECTION 3
This 100-foot-high triangular lightweight
steel tower station was guyed at the 90-foot level.
On top of the tower were a pair of User-furnished
outrigger beams which supported specimens at
that level. A sheave assembly was provided at
the outriggers to place the specimens.
STATION:
861
SITE:
Yvonne
USER:
DOD/WADC
PURPOSE:
Speed of Sound
Measurements
PARTICIPATION: 20
DESIGN PSI:
None
CONSTRUCTION: 4-17-58/4-26-58
Located in a 50x100-foot stabilized area,
this station was composed of a User-furnished
pipe and tripod assembly.
(Neg. No. W-V-414-6)
Figure No. 2-34.
Station 810.01.
The two camera mounts were located about
40 feet in front of the shelters. Each consisted
STATION:
862
SITE:
Nan
USER:
DOD/WADC
PURPOSE:
MSQ Radar Tracking
PARTICIPATION: None
of a pair of 8-inch pipes, 5 feet high, and fastened together with 14-inch side plates. The mounts
were set in a 4x7x3-foot-deep concrete footing
DESIGN PSI:
STATION:
831
SITE:
How
The station consisted of a stabilized area
used for parking MSQ trailers. Timing signals
were provided. With the relocation of the ABMA
Program, this facility was cancelled.
USER:
DOD/EG&G
PURPOSE:
Zenith Tracking
STATIONS:
870.01 and .02
SITE:
Yvonne
USER:
DOD/CWL
PURPOSE:
Thermal Flux
which also contained a 2x3x2-foot-deep hole
for use as a battery box.
PARTICIPATION: None
DESIGN PSI:
None
CONSTRUCTION: 3-10-58/3-10-58
This station consisted of a 10-foot-square
concrete slab near the 75-foot tower, Station
92.03. With the relocation of the ABMA Program, this facility was cancelled.
STATION:
860
SITE:
Yvonne
USER:
DOD/WADC
PURPOSE:
TV Tower
None
CONSTRUCTION: 3-24-58/3-27-58
Measurement
PARTICIPATION: 1 and 15
DESIGN PSI:
None
CONSTRUCTION: 7-21-58/7-27-58
User-furnished submarine-type steel shelter
stations were installed underground in holes
5144 feet deep and 6x9-foot clear at the bottom
and backfilled to the lip of the hatch with sand
a One timing signal was provided to each
shelter.
PARTICIPATION: 20
STATIONS:
871.01 and .02
DESIGN PSI:
SITE:
Yvonne
USER:
DOD/CWL
None
CONSTRUCTION: 3-31-58/4-5-58
Page 88