CHAPTER II, SECTION 3 were bedded and covered in a sand-filled wooden crib structure. The crib consisted of five longi- tudinal continuous spread footings and vertical planked division walls tied together with ribbons, planked over, and covered with earth fill. Beginning at the second retaining wall and on radial alignment with the T-duct and the work point of Station 20, four runs of pipeline were constructed. The pipelines terminated at a concrete retaining wall at the south side of Station 20. They were supported on a steel post and beam with upright saddle detail supported on three concrete spread footings at three of six support frames. At three more closely spaced pipe supports the lines were suspended from a steel beam over two steel posts by adjustable tie rods and adjustable horizontal tie rods. These lines were also covered by earth-fill. STATIONS: 1528.01 - .02 SITE: Yvonne USER: LASL PURPOSE: Fluor Stations PARTICIPATION: 20 DESIGN PSI: None CONSTRUCTION: 3-22-58/4-10-58 Station 1528.01 was in two parts. First, a wood frame platform tower, 5-foot-square in plan, 22 feet high, was located at the north end of Site Yvonne near the high tide line. Tower platform was at Elevation +27.21, The tower was supported on an 8-foot-square by 16-inchthick re-inforced concrete spread footing. The second part of this station was a wood-frame baffle structure located approximately 500 feet southeast of the platform structure. The frame closely resembled a sign board and consisted of two bolted, laminated 4x12 columns, the lower ends buried 10 feet to support a 2x12 frame sheathed with 4-inch plywood on one side between columns. The sheathed area was 12 feet wide by 12 feet high with a 5-foot-wide by 2foot-clear opening at its geometric center. Top level of this frame was at Elevation ~ 34.0, The structure was painted two coats of blackboard slating paint. Station 1528.02 was also in two parts. First, the wood-frame platform was only 2% feet high above the top of a spread foundation slab on top of a deep coaxial cable fill close to Station 20. Top of platform was at Elevation +27.17. (Neg. No. W-V-240-11) Figure No. 2-51. Page 108 Stations 1527 and 1611 — 40% Complete.

Select target paragraph3