BEST AVAILABLE COPY
Le
Radiation Exposure Potential:
One hour after the KING shot, a
~
4-man recovery party was to visit Medren, Runit, and Lojwa to
.
retrieve data for Programs 3.1, 3.2, 3.5, 3.6, 3.8, b.2, and
6.13.
Recovery time for these projects was estimated at 2 hours.
At 0900 the day after KING, a 3-man team on an LCM was to remove
the rafts from the lagoon (Table 4.6, Missions 4 and 14).
Staffing:
Only the project officers can be identified as accruing
a radiological exposure, presumably in the course of executing
tasks associated with the project.
His dose was 0.4 rem.
Six
enlisted men of the Curtiss are credited with aiding in the
project but none were apparently badged and just what their
Wu
—pP
/
.
ae
7
IPO 132.1TU1#627.
Project 6.3 - Shockwind, Afterwind, and Sound Velocity
Agencies:
30 2.
Sandia Corporation (SC)
Los Alamos Scientific Laboratory (LASL)
Operations:
For MIKE, instruments were placed on Bokaidrik,
Boken, Enjebi, Mijikadrek, Bokenelab, Aomon, and Medren.
Planned
2
L
recovery is shown in Table 4.3, Missions 21 and 23.
=
S
portion of this project, three stations on Runit and one on Medren
=
7
were used.
=
Missions 6 and 13).
\
be
i
-
deus
NER,
Fv,
VoYe
ae)
Project Report:
For the KING
V
MC Sire.
\
assistance was is not clear.
-
1.
{
ty
= _
Two recovery missions were planned (Table 4.6,
Radiation Exposure Potential:
Recovery missions were low priority
: =
and would not have exposed personnel to high background radiation
3 3
levels.
(To
x
an oY
4-56