V40D ZJSAJIAVA T2436
two LASL civilians, who worked closely with the project are
included in the dosimetry in Table 4.4.

Project Reports:

IPO 132.1TU1#620, #621, #622, #623, #624, #625.

BEST AVAILABLE Copy
Program 3 -- Scientific Photography

This program called for photographic documentation of many aspects of
both tests.

According to WT-636 (IPO 132.1TU1#636), TU 1 of TG 132.1

assigned eight civilians from an AEC contractor, Edgerton, Germeshausen,
and Grier (EG&G), and three Air Force men to work on Program 3 overall
(see Table 4.1).

The IVY History lists the program leader as a LASL

civilian (IPO 132#1, p. 53).

Of all these program level personnel, only

his dose can be identified on the Consolidated List (IPO 132.1TU7#2), and

prtpee

Gas

Pphrce.

it was 0.560 rem.

'

usect

1

aye

Project 3.1 - Ball of Fire Yield

Agency:
Operations:

Edgerton, Germeshausen, and Grier (EG&G)
For MIKE a total of 29 Cameras were used, 5 on

Enjebi, 2 on the USS Estes (AGC-12), and 12 on Medren (IPO 132#2,
pp. C-2 and C-3; IPO 132.1TU9#1, p. 16).

The high-priority

recovery schedule called for three men assigned to this project to
helicopter back to Medren from the Rendova 20 minutes after the
detonation.

At a later time, two men were to helicopter to Enjebi

(see Table 4.3, Mission 15).

The schedule of less urgent recovery

4-32

Select target paragraph3