Project 2.1b staffing was apparently interrelated with,

although somewhat separate from, the rest of the NRL experiments

(Projects 2.la, 2.2, 2.3, 2.4, and 2.6).

In the project report

seven NRL civilians were cited as being primarily responsible for
carrying out the KING experiments.

Of the seven, only four appear

on the Consolidated List and their dosimetry is shown in Table 4.4.
Project Report:

Project 2.2 - Timing of the Fission Phase

COpy

Project 2.3 - Rise of the Fusion Reaction
Project 2.4 - Propagation of the Fusion Reaction

Agency:

Naval Research Laboratory (NRL)

Operations:

Gamma rays from the MIKE detonation passed 9,000 feet

through the helium-filled flume to instruments in Station 202 on

Boken Island.

Signals from these instruments were then

transmitted by wire to recorders in Station 200 nearby (IPO 132#2,
pp. B-3 and B-4).

For recovery, see under Project 2.6 below.

Radiation Exposure Potential:
Staffing:

Same potential as Project 2.1la.

See Project 2.6.

Project Reports:

IPO 132.1TU1#620, #621, #622, #623, #624, #625.

Project 2.5 - Measurement of Transit Time

Agencies:
Operations:

Sandia Corporation (SC)
A transmitter in the KING bomb case sent radio

signals to receivers in two B-50 aircraft from TG 132.4's Test