STEAM
Site
>
;
Elmer
BoLlers Required
Boilers Instalied
DATE: 20 Angust 1955
Conditien
Remarics:
ROLLOTE
e
Spares
On
[Additional Spares
0n Order
Recommended to be
ordered
1 ~ 50 H.P. (Mess Hall)
1 ~ Steam-Master - 50 H.P.
Purch. Bec. '53 (Fair)|
Overloaded
1 - 30 8.P. (Distillation
1 ~ Amesteam - 30 H.P.
Purch. Mar. '52 (Good)|
Ample size
Fred
4 - 50 H.P. (Laundry)
4. ~ Amasteam = 50 H.P,
Purch. 1950 {Fair}
Ample
Kan
1 ~ 20 H.P. (Mess Hall)
1 - SteamMaster - 20 H.P.
Good
Ample
|
Fox
1-20 H.P. (Mess Hall)
1 ~ Amesteam ~ 20 H.P.
Good
Ample
‘
Ample
1 1~205.P,
te
Tare
Ywonne
1 - 50 HP.
(Laundry)
1 — Steam-Master - 50 H.P.
2 - 50 H.P. {Distillation & PeH.)| 2 — Amesteam ~ 50 H.P,
1 — 20 H.P. (Parachute Loft)
1 - Steam-Master - 20 H.P.
Purch. Dec. 153 (Poor)|
Overloaded
1 = 60 H.P, Amestean
1 - 50 H.P, Amesteam
Purch. 1950 (Fair
Anple
Installed Feb, '54(Fai¢)Ample (Used boiler priof to ins
[| 1-20 H.P. (Mess Hall)
1 -—.20 H.P. (Mess Hall)
L= 5 H.P. (Distillation)
1 - Steam-Master ~ 20 H.P.
Good
1 = ? (AEC-CAw1025) = 5 H.P,| Good
Ample
Ample
Norsuial
1-20 5.P. (Mess Hall)
1 = Amesteam - 20 H.P.
kxple
Gene
1-20 H.P. (Hees Hall)
Good
- 60 H.P. Amesteam
4on)
|
kmple
1 - 20 HP.
David
.
Spare ~
Total
“ETA 8/26/55
2~ 20 H.P.
Hth =» 20 HP.
Steam—-Ma:
2-60 HP.
1l- 50 H.Pe